Which balls should go into the count?
Record the sets you inspect over a typical week. For each set, note its identifier, how many balls actually need surface restoration and when they must return to play. One dull cue ball counts as one, even if the rest of its set travels with it for comparison. Record chipped or cracked balls separately for assessment. Including every ball you own in the calculation can make a small weekly job look like a full-time operation.
How does a weekly total become an hourly requirement?
Suppose a club identifies 96 balls for restoration in one week. It has two evening sessions available, each with three working hours. The target is 96 ÷ 6, or 16 finished balls per available hour. If the same 96 balls must all be ready after a single three-hour session, the target rises to 32. These figures describe the club’s schedule. Ask the supplier for separate evidence about the machine’s output.
| Time available | Total hours | Balls needed per hour |
|---|---|---|
| Two 3-hour evenings | 6 hours | 16 balls |
| One 3-hour evening | 3 hours | 32 balls |
How much of a shift is available for processing?
Use one consistent timing method. If the quoted cycle time covers machine operation alone, allow separately for loading, unloading, inspection and any repeat work. If you time a complete batch yourself, start when the operator begins loading and stop when the accepted balls are ready to return. Count those balls once and use the full elapsed time. Deducting inspection time again would understate throughput.
What happens on the busiest day?
Compare the largest group of balls due back on the same day with the time available before that deadline. A club might find most balls after a weekend event but have only Monday morning to process them. Note whether the work can be split into two sessions and how many sets must remain on the tables. A weekly average can hide a deadline that even a lightly used machine cannot meet in the available window.
What should you send with the equipment enquiry?
Include the ball type and diameter if known, average weekly count, largest batch due together and available working hours. Ask for the batch size and total handling time for comparable balls, plus the basis for the figures. Use the same units for both proposals when comparing suppliers. A result for balls per machine cycle only becomes comparable with your hourly target once the full batch time and accepted count are known.