Can the supplier arrange a trial with your balls?
Ask whether a sample trial is available for the model you are considering. Agree which balls may be sent, the trial and freight charges, the return address and how results will be documented. Confirm who will operate the machine and whether you can observe the full run or receive a continuous recording. Send the balls only after the supplier has agreed to receive the specific sample list.
Which samples will tell you the most?
Choose examples that resemble the work you expect to do. A useful small group might include a cloudy cue ball, a dark ball with a visible curved scratch and a lightly worn ball. Give each ball its own identifier, photograph both sides and record the type and diameter if known. Flag chips or cracks separately for the supplier to assess. The results will apply to the samples and conditions tested.
How do you make the before-and-after photos comparable?
Place the ball in the same position under the same light before and after the trial. Include a wider shot that identifies the ball, then photograph the marked area close up from the same angle. Add a second angle under side lighting so glare cannot conceal a scratch. Compare how smooth the surface looks, whether the original scratch is visible and whether the highlight is clear and even. Record any other checks separately.
What should be recorded during a batch?
Write down the model and configuration used, sample count, operator, consumables and total elapsed time. Time the batch from loading to inspection, and log any second pass against the affected ball. For example, if six balls enter a trial and two need another pass, record four first-pass acceptances and two repeat passes. That distinction matters when the sample results are later used to estimate the staff time required at your club.
What goes into the acceptance agreement?
Use the trial record to agree on the model and configuration to be delivered, the reference samples, the viewing conditions and who will sign off the result. State which outcomes count as acceptance and what happens if further work or another check is needed. Keep a copy of the photographs, timings and agreed items with the quote. This gives both parties a common reference when they inspect the delivered equipment.